Delta Tau Geo Direct PWM Amplifier Manual de Instalação Página 34

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 33
Geo Direct PWM Amplifier
Power On/Off Procedures 34
POWER ON/OFF PROCEDURES
Caution
Caution
Caution
Powering up the Geo Direct PWM Drive must obey the following procedure:
1. Make sure that PMAC is powered up, and that the PWM cable is connected
2. Apply 24V logic power to the Geo Direct PWM Drive
3. Wait a minimum of ~3 seconds
4. Apply main bus power
5. Wait ~ 3seconds before enabling the drive (motor)
Powering down the Geo Direct PWM Drive must obey the following procedure:
1. Disconnect main bus power
2. Wait a minimum of ~5 seconds
3. Disconnect 24V logic power
Cycling Main Bus Power
Caution
Cycling main bus power must obey the following warning restrictions. A delay should be inserted in
either software, hardware or both to ensure that these restrictions are conformed.
Caution
Vista de página 33
1 2 ... 29 30 31 32 33 34 35 36 37 38 39 ... 52 53

Comentários a estes Manuais

Sem comentários